Infrastructure
Bulgarians Travel 1 Hour Less to Beach
Lot 3 of the southern Trakiya highway, connecting the town of Nova Zagora and the city of Yambol, will be launched Thursday. The length of the new section is 35.7 km. The...
Type at least two letters to see matching pages.
1 min read Construction Source: Novinite
From our news archive: this article was published in July 2012. Figures and rules may have changed since.
The delays in the construction of Lot 1 of Bulgaria's Maritsa Highway leading to the border with Turkey will be made up for, according to the Bulgarian government.
The construction of Lot 1 of the Maritsa Highway – between Orizovo and Dimitrovgrad – was inspected Wednesday by Prime Minister Boyko Borisov and Regional Development Minister Lilyana Pavlova.
Lot 1 between Orizovo and Dimitrovgrad is 31.4-km long and is part of the Pan-European Transport Corridor connecting Central and Eastern Europe with the Middle East and Asia.
It is scheduled to be completed in 25 months by the Italian contractor Cooperativa Muratori & Cementisti, CMC, from Ravenna.
CMC has been selected through an international public tender. The financing of over BGN 133 M is provided by the EU Operational Program "Transport", another BGN 27 M are provided from the Bulgarian budget.
By the end of July 2012 the builder is supposed to start the construction of 480-meter long bridge on the Maritsa River, which will be the largest facility along the highway section's route, Darik Radio reported.
The delay caused by archaeological excavations – which are supposed to be done by August 2012 – will be made up for with additional workers and equipment, PM Borisov said.
In his words, there are 250 workers and 135 vehicles currently working on the construction of Lot 1 of the Maritsa Highway.
Originally published by Novinite.
Infrastructure
Lot 3 of the southern Trakiya highway, connecting the town of Nova Zagora and the city of Yambol, will be launched Thursday. The length of the new section is 35.7 km. The...
Infrastructure
All trains serving the railroad line between the second largest city of Plovdiv and the town of Dimitrovgrad in southern Bulgaria can now travel with speeds up to 160 km/...
Infrastructure
The section of Bulgaria's Trakiya Highway between Nova Zagora and Stara Zagora was officially opened on Sunday. "The construction of highways will yield its results over...